ADVANCED WATER TURBIDITY TREATMENT AND MIXING SYSTEM
The patented PUREMIX delivery system with the low shear Boerger Rotary Lobe Pump utilizes an effective coagulation and flocculation process to reduce water turbidity levels. This mixing system out performs any static mixer on the market and has a variety of applications.
Companies used to have to choose between environmental consciousness, lower costs and product effectiveness.
We understand the challenges you face when it comes to managing water – whether you are collecting it from surface waters or discharging it into the environment. You need to meet regulatory requirements and optimize your operational costs. At the same time, stakeholders, citizens and governments are demanding sustainable water treatments.
That is why we have created a full line of easy, effective water treatment products that meet your performance requirements and budget, while satisfying environmental concerns.
Projects
Attaway Services/Ft. Lauderdale International Airport
Attaway was having issues with turbid water entering storm drains and a needed quick resolution. PPS designed and installed a treatment system and Attaway was operational within 48 hours.
Nelson Construction/Keystone Road Improvements
Nelson Construction had several companies assess their water and none were able to provide a solution. PPS tested water and customized a product to solute it in 48 hours
WRS/Key West
Water treatment design and set-up by Pure Polymer Solutions
Prince Contracting
Customized treatment design by Pure Polymer Solutions
Tampa International Airport
At Tampa International Airport the contractor, Civil Site Constructors, Inc. faced issues when discharging water into the waterways which are attached to Tampa Bay. The bay is teaming with marine life and all involved wanted to prevent impact to the environment. Civil Site Constructors contacted Pure Polymer Solutions to design a solution for removing water without allowing NTU’s to exceed 29 above background. Pure Polymer Solutions collected water samples to determine which bio-polymers performed successfully and with the least amount of impact.
Interstate 75
Haleakala Construction was initially storing job site water in a large retention pond, but ran out of storage space. Pure Polymer Solutions was brought in and actively started treating, giving results of 800 NTU’s down to 1.81 NTU’s prior to going into a stream, which eventually makes its way into the Hillsborough River. Haleakala was able to move forward with laying storm pipe without any delays and kept the job on schedule.
Turtle Creek Club
Pond 14 at Turtle Creek Club has had an algae bloom each year in which the pond would turn from pristine to green every summer. Pure Polymer Solutions came in and installed a pond aeration system, along with using enzymes to resolve the pond turning green. Results were slow, because it takes longer for enzymes to work, but after 1 month of treatment, the pond was back to normal and without the use of standard chemical treatments.
Concord Station
Lennar Homes was trying to allow ponds to drop naturally, but particles in the ponds stayed suspended for several months with very little improvement. Pure Polymer Solutions started treating the ponds that were closest to the outflow from retention ponds and was able to significantly reduce NTU’s and the overall appearance of the ponds.